Subjection of the mast.
The subjection of the masts can be installer in different points of the installation, in the wall, in the roof, flat base...
When we must subject a mast, normally it has two points and stay upright. It is recommended to install 1 meter apart, so that the support mast as possible wind pressure.
When we choose a mast over 6 meters are installed clamping winds.